Our Project Methodology begins with a discovery phase by presenting a draft of our methodology or use your methodology. Clarity about the objectives and scope are obtained understanding your business needs and project requirements. Goals, time frames, potential issues, and architectural requirements are gathered. A preliminary timeline and the approximate cost are determined, based on the functional point analysis. A project plan document is made.
Our project management process is to develop a high level project plan. We detail, and track the project as it proceeds, so that you can see the progress. The process logic and business rules are evaluated. A sketch of the system structure is prepared. The scope of data and procedure interactions described. Design accuracy and completeness is verified. Technical design developed. The technical context and requirements are explained. The data structures are formulated. The final Technical Software Design Document is completed and frozen. The project plan document is rechecked. Requirements of change are collected after the design is proposed.
Our design phase provides us a road map. We outline analysis, design, objective and goals. Conduct introductory discussion with strategy and situation analysis. Evaluate Technology and Software. Develop an initial layout as well as the features and capabilities. We form an interaction and complete several rounds of revisions, reviews and refinements. Define the final design, layout and features.
The development procedures including configuration and control are prepared, the database environment is set up, test data and system documents are produced, Coding is done by Programmers, method level and documentation by individual developers is facilitated. The technical software design document is revisited if necessary. Stream testing is done by our QA team. Metrics about change in design documents during development is gathered. The Project is then fully implemented.
As proponents our methodology, we emphasize early and continuous testing during development, short design cycles, and flexibility for customer design changes. During the testing phase Validation Tests, Integration Tests, System Tests, Benchmark, load tests, acceptance tests are performed. Training deliverables, user deliverables and implementation deliverables are made ready. The production system is fixed. The Users are instructed. Action is taken in critical situations. Another requisite of this phase is to draw new dimensions from the acquired experience. A final launch is then executed.